Friday, October 30, 2009

A/C Unit is in!


The A/C unit was recently added to the house. It is 21 Seer unit. It is going to definitely help this house be an energy efficient as possible. It is a big unit!

Saturday, October 24, 2009

It is time for the Tile!

Guest Bath Shower
Guest Bath Floor
Master Bath Tub/Shower
Master Bath Floor

The tile was installed in both the master bathroom and guest bathroom. For the master bathroom, we choose a Travertine to be laid in a diagonal pattern for the floor and tumbled marble to be placed in a brick pattern for the shower. In addition, we choose accent mosaic tile for section of the shower wall.

In the guest bath, we choose the traditional white hexagon tile for this time period. The walls in the guest shower will have bright white ceramic subway tile laid in a brick pattern as well with glass mosaic tiles as an accent. In addition, the guest bath will have beadboard added after the tile installation is complete.

Thursday, October 8, 2009

Trim & Garage Door are done



Today, the accent paint was completed around all the windows and the garage door was added. The garage door will eventually be the same color as the trim accent on the windows. I love these colors!!!

Monday, October 5, 2009

It looks like a House!


Sherwin Williams Paint
Main - Artichoke
Trim - Antique White
Accent - Fired Brick (not done yet)

Friday, October 2, 2009

Completely Sheetrocked

All the walls have received their new sheetrock (then taped and floated).  The pictures speak for themselves.  So exciting!  It really feels like a house. (I can't say that enough) 


Upstairs Bedroom
Master Bedroom


From back of Kitchen through Dining Room and Living Room