Monday, November 23, 2009

Fans, Fixtures & More


It was an exciting day today! All the fans, fixtures and more were installed. It is a lot of things to be installed. Here is a list that we had to purchase:
1 outdoor fan
4 indoor fans
4 sconces for exterior
1 sconce for interior
1 chandelier
1 pendant light
1 track lighting
3 vanity lights
1 kitchen faucet
3 bathroom faucets
1 bath/shower combo faucet
1 shower only faucet
1 doorbell

Front Porch



















Guest Bathroom















Upstairs Bedroom

Thursday, November 19, 2009

New Columns

One of the details that we added to the house is to have columns and shelves built as a divider between the living room and dining room. However, we did not want to close the rooms in. We wanted the rooms to still have an open feel but be defined. This is what we got! They are just beautiful.
Before



After being painted

Wednesday, November 18, 2009

Granite has been installed. They still have to make the holes for sinks and faucets, but at least it is in!

Master Bathroom

Kitchen

Tuesday, November 17, 2009

The Painters are working hard!

For the last two weeks, the painters have been working extremely hard. There is a lot that goes into prepping and painting an interior of a house. They have to scrap all the old paint off all the doors and trim, caulk every crevice in the house, place paper and painters tape up everywhere including the inside of the cabinets, prime the inside of the house and paint two coats of paint on every wall, ceiling and piece of trim. It is a lot of work to do in two weeks. Below are some photos through the different stages.

Doors Scrapped


Windows taped and trim prepped
Cabinets primed